PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Securing the shear wall panels at Elev. 4-Stair -2 Facing South (800x600).jpg Stripped Elev. 5-6 2nd Floor Facing South-West (800x600).jpg Lifting the Slip Forms at Elev. 1,2,3 2nd Floor Facing South -2 (800x600).jpg Backfilling Elev 5-6. pit Foundation Walls Facing North (800x600).jpg Backfilling Elev 5-6. pit Foundation Walls Facing West (800x600).jpg Lifting the Slip Forms at Elev. 1,2,3 2nd Floor Facing South (800x600).jpg Movign the fence at Lyon Street Facing North (800x600).jpg Footing layout at Elev. 7-Stair -4,5 Facing West (800x600).jpg Footing layout Elev. 7-Stair -4,5 Facing East (800x600).jpg
Previous pageNext page Backfilling Elev 5-6. pit Foundation Walls Facing West (800x600)
Backfilling Elev 5-6. pit Foundation Walls Facing West (800x600)